This blog has moved

The blog can now be found here, including all the archives and tutorials. Subscribe to the RSS feed here.

Main

the big four oh Archives

April 21, 2006

Well, in that case

I don't think I could have gotten a more positive response to good ol' Drake, if I had bribed you guys. So, I've cleaned up the pattern, fixed the typos (I hope) and posted him for sale.

People have made some great suggestions for modifications and variations. One I like in particular was to convert him to a messenger bag. While I no longer have the yarn or even the dyelot numbers to do that, I think it's worth mentioning for anyone who might be considering making one for themselves.

Curses

Next up, a possible exercise in futility. I want to knit Leo a sweater. I do this with a great deal of trepidation. Leo is not a fiber artist of any sort. He switches between calling it "sewing," "crocheting," and "knitting." When I wind, spin or knit yarn, his general thought is "Aren't there machines to do that?" I do not begrudge him this. He takes no end of joy in things that bore me to tears.

I have knit Leo a boatload of hats and I've even knit him a sweater before. He is always appreciative, but I have never knit him something he is totally satisfied with. The perfect item will always be lace weight thin and softer than silk, while still being manly in every way. Colors? Sure, as long as it's grey, brown, navy, or black.

So why do I want to knit him a sweater despite the fact that he hasn't asked and I'm pretty sure he won't be entirely content with it? Well, I want to design a few men's garments, to fill out my pattern portfolio, and I think the design is one that marginally less picky men will like, but I also can't help myself. I think he's pretty darned wonderful and knitting is about the most special thing I can do for him, so dammit, he's getting a sweater.

I started with a trip to the LYS where I got 4 skeins of yarn.

All were dubbed "a little thick." But I informed him that it would just have to do and he could wear it when it's colder out. I love him, but I'm not knitting a sweater on needles smaller than US #3.
So he began the feel test.
The top was the finest, but the superwash merino just wasn't soft enough.
The alpaca was soft enough but too thick
The Cathay was dismissed out of hand. No interest there
The last was the Baby Cashmerino. Thin enough to be acceptable, soft enough to pass the test, and if bought in a different color it would do.

So I shopped online for some good colors and prices. I know my LYS doesn't carry the quantity and color selection required. Webs had the best price once the discount was applied and I made my order.

In the mean time, I swatched.

Yup, the whole thing will be in ribbing. May the knitting gods grant me the strength to finish this baby.

Both swatches have been through the washing machine and laid flat to dry so I know the yarn will survive his general MO for washing sweaters. And yesterday, after about a week of waiting, the yarn arrived.

That's 13 skeins of grey/blue Baby Cashmerino.

April 23, 2006

Ribbing ribbing ribbing ribbing ribbing

I took a couple rough photos of the machine knit cardi and cami

The pictures aren't so good because there was only a little daylight left when I took them. And I've been doing housework all day, so the hair; it is in no condition for photographing. But, I think it gives you a general idea of what the pieces look like.

I'm now fully engrossed in Leo's sweater.

This is the back piece. I'm about halfway to the armsceye. It looks thin, but it will block out much wider. So far so good. I got most of it done while watching a movie over at a friend's place. It was a great, relaxing evening.

Leo went out with some friends and brought me home this:

He’s so sweet. Little things like that make knitting miles of ribbing seem fun.

April 27, 2006

Keep going while the going is good

I've been cranking away on Leo's sweater, which I simply must find a name for since it's early stages bare a striking resemblance to someone else's sweater for a Leo. I am happy to report that while my Leo will be wearing a ribbed sweater, I have not accidentally designed a piece that is nearly identical to that one. But I do believe that the two men are cut from the same cloth (or should it be; knit from the same yarn.)

So, for the start of the sweater I cast on of about 120 stitches, and worked in ribbing for about 120 rows. In the world of exciting things to do, this rates at about a -3. But, we are at the early stages of knitting this piece and, like a relationship, the things that may annoy or bore me later, are simply delightful now.

So knowing that the thought of casting a new piece may feel like torture, by the time I finish the back piece, I've decided to leverage my existing enthusiasm and get the most tedious bits out of the way first.

So there is the back, knit up to the armsceye, with the front, cast on and knit for a few rows, sitting on top.
I gently blocked the back so you could see the fabric as it will be when completed. The first inch of each piece is knit on a slightly smaller needle so that the bottom edge won't flip out in some wonky way.

Now, when it comes time to knit the rest of the back, it won't seem quite so dreary. I'm thinking I'll need to knit both sleeves at the same time as well, to rid myself completely of second sleeve syndrome. Some people find knitting the sleeves first to be the best remedy, but in a man's garment which will be knit rather long, I suspect that this portion of the knitting will be the hardest to find motivation for. Time will tell if I'm correct.

I've also been spinning a little. I actually completed this skein several days ago.

It's the Redwood colorway from my Spunky Eclectic haul.

May 8, 2006

2 out of 4 ain't bad

That's 2 out of the 4 big pieces for the Leo sweater, of course.

And this is not a sleeve:

It's the back of the sweater. Leo is not a super skinny man, it just needs some blocking.

Yah, I know that most people block at the END of the process, but I bet most of those people don't have a cool new blocking board and blocking wires. Actually, that's only gravy for me. I like to do my finishing as I go. It keeps me motivated.

Quite a few folks have asked me if I'll be using my machine to knit this piece. In this case, it won't be possible. My machine has no ribber, and the manual task of dropping the stitches that should be purled and using a latch hook to rework them, is tedious and makes my back ache. I'm sure I'll machine knit Leo a sweater in the future, but this piece is all hand knit.

I'm back working in Orange County this week, which means no bus, and lunch at my desk, so progress is slow on the sleeves. Knitting Gir was a nice little instant gratification project, but I'm hoping to crank through as much of the sleeves as possible over the next couple weeks.

May 12, 2006

Thank god I'm knitting them both at once

You know, I'm not completely burned out on knitting navy blue ribbing, but I'm pretty sure that having to start another sleeve from scratch would be a challenging endeavor. I think that knitting them both at once is a good choice. It's a bit of a bummer knitting all those stitches in a row and knowing I have many increases ahead of me, but in the few minutes I'm finding to knit each day, I can usually zone out and enjoy myself. My mind definitely starts wandering, yearning for future projects, but there's also that side of the project that's all about doing something special for Leo. I know, so sappy.

So those are the two sleeves, almost a third of the way to the sleeve cap. They are perched upon the blocked back piece, for scale.

Having folks take my quiz has been really fun, by the way. It's interesting to see how folks imagine my life to be. For those who didn't score so high, don't feel bad, it's not like most of that stuff comes up in day to day blogging.

May 19, 2006

Pleading Patients Overlooked

I can't quite decide what my the PPO portion of my medical insurance is referring to. I thought it was shorthand for "the world is your medical oyster" but I'm finding myself a tad frustrated today. The short story is that I need to get some inoculations so I can take a business trip to India in July, which is a very cool opportunity but is involving a lot of effort I hadn't originally considered. I think I've sorted most of the confusion out in what appears to be the first instance of my insurance company being more helpful than the doctor's office. Who knew? Anyway, I have two sore upper arms and a yellow card detailing my immunities to some rather icky viruses. There was also a bit of time to knit on Leo's sleeves.

I will still need some boosters and a tetanus shot, as well as a few prescriptions, but I've got the stuff that needed a lot of lead time out of the way.

Working on Leo's sweater, I've given myself little leeway to do much else. Obviously, I knit Gir but there really hasn't been much else. I occasionally pick up my spindle which has some lovely alpaca on it.

It's not that I'm not enjoying spinning it, it's just that I really want to crank through Leo's sweater and I cannot spin and knit at the same time. But, imagine if I could...oh my own vision of Valhalla.

Knitting miles of ribbing does give me ample time to consider what comes next. I'll definitely be working on the clown hat, but what should I do in India. July = monsoon season in the area. Temperatures, apparently, can average around 120 degrees though I'm told it's quite a bit cooler where we'll be. Even so, I'm thinking small, portable, and able to be worked on mindlessly. All signs point to socks. I'm not a huge sock knitter, but I am feeling that 2 socks on 2 circs will prevent second sock syndrome AND be more likely to survive a trip through security and customs without a lot of explanation. I like working on DPNs, but having a preference for metal to wood means that's probably a bad idea.

So last night I ripped out a partially knit, now abandoned project that was started with some Socks that Rock in colorway, Carbon. It needed a bath and hanging to get the kinky bits out but now looks as good as new.

I also have some solid shades of koigu around and plenty of self patterning sock yarn, all of which will only take up a small amount of space in my luggage but which should easily entertain me for my 24 hour long commutes to and from India as well as the small amount of down time I'll have during the trip.

May 22, 2006

Because he's worth every stitch

Since my post on Friday, I've done about 80 rows on Leo's sleeves. I am finally at the sleeve cap, which means no more increases. Not a moment too soon, I say. There were a few moments when I mentally psyched myself out and I wasn't sure I'd ever see the end of them.

There is actually a likely possibility that the sleeves are a little bit long. Personally, I'd rather have to shorten a ribbed sleeve than have to lengthen one. Ribbing is unidirectional. If you pickup and knit from the other direction, all stitches will be half a stitch offset from the point you picked them up. This means that lengthening a ribbed sleeve is best done by knitting a new cuff and grafting, in ribbing, to the base of the sleeve. I'm very comfortable with grafting in stockinette but ribbing is a whole other beast.

But you know, it's easy to find motivation when knitting for Leo. It's not all about eating dog cookies at our place. On Friday, Leo treated me to dinner at my favorite Italian restaurant.

He said he loved me so much, even the stains he leaves on his placemat are heart shaped.

After dinner, we made an attempt to go out and tear up the town, but having both gotten up around 6 am, we were pretty beat by 11pm and the bars still all seemed empty. Leo did take this cool picture of us reflected off the mirror behind the bar.

You can see his camera peaking through the bottles, if you look carefully.

It ended up being an early night, and a quiet weekend. On Saturday, I knit sleeves while I watched Memoirs of Geisha. It may not be as good as the book, but it's been quite a few years since I read the book and the cinematography alone was captivating enough to hold my interest. There were a few things I remembered well enough to feel like I could pick apart the movie a bit, but it never stopped me from enjoying it.

May 29, 2006

I love long weekends

Given my druthers, I'd gladly work 3 - 13 hour days a week to have 4 day weekends. Alas, that probably isn't going to happen for me so I'll just have to enjoy the long weekends bestowed upon us by federal holidays.

Leo's sweater is nearing the finish line. All the big pieces are done and assembled. It's still damp here and in need of some final blocking. The wash was just to get all the commuter grime off of it, but I'll do a proper steam block when it's dry. It'd probably be better to wet block it, since it's already wet and all, but I'm a strange girl.

This is the back view. The front is largely the same but the neck is a little lower.

While I'm waiting for the sweater to dry so I can start the neck, I've been knitting some socks. I'm one of those people who is more than happy to knit on DPNs. I have absolutely no aversion to them and find that socks zip along just merrily on them. However, I have some concern that I may not be able to take metal DPNs on the plane with me to India (nationally, it's not a problem, but internationally, there may be some issues). So I'm attempting the socks on two circulars method.

I have to admit, I don't care for it. To me, this method is slow and clumsy. I've improved the process for myself by clipping the two socks together, which resolves some of the issues I had with the socks constantly migrating away from each other and increasing the time it takes to go from knitting one sock to the other.

Even though I really do not like this method, now, I feel obligated to try to knit a whole pair in this manner. It may simply be a matter of acclimating to the technique. Even so, I'm not sure why this method is so popular amongst the DPN averse. In truth, the circulars simply act as two very long DPNs, so I'd think anyone who could master this technique, could certainly master the use of DPNs.

Ok, I'm off my soapbox here. It's true that there are merits to being able to knit two socks at once, and the circulars fold up more compactly than DPNs, so I still feel this endeavor is worthwhile.

I'm not sure what the yarn is, I've long lost the label. It looks a lot like Opal but it's not, it's some other, less known, self striping sock yarn.

You may have noticed that the underside is slightly different than the top, at least down at the toes. This is because I worked a short row toe, so I started from the ball of the foot, working flat to the toe then back down to the top of the foot before joining in the round. Personally, I prefer the idea of a bright red toe, so that's going to be the top.

June 4, 2006

When birthday gifts come late, it means the birthday lasts longer

Some people give me way too much credit, and Julia is one of those people. I wish it were true that Leo's sweater were finished and blocking, as she suggested, but it's not quite the case. However, it is terribly close to being done.

I'm just working on the neck now.
Leo looks amazingly good in turtlenecks, however, with sweaters, he finds that his stubble is always tearing the turtleneck apart, wearing out the sweater long before it's truly ready to be retired. This sweater will have a mock turtleneck and several separate full turtleneck pieces to tuck in and switch out as necessary. If that just doesn't work, I have the yarn and can simply remove the bind off on the mock turtleneck and knit a full turtleneck each time one wears out.

Leo has tried on the sweater up to the point you saw it in the last post. He has declared that the fit, fabric and look are all up to his standards, so I'm feeling pretty good about the endeavor.

For those of you who knit a lot of raglans, you may have noticed that the shoulder shaping is a bit different than one might expect. Instead of a steady slope, there is a true shoulder shape at the top. Do you see what I mean?

Here's a little sneak peek of how I did that.

There is an extra "raglan" running along the top of the shoulder that extends from the neckline to about the end of the shoulder (I actually stopped about a half inch short of the final shoulder length). Calculating it was an interesting challenge and I did it by printing out gauge sized charts and origami folding it to the right shape. This is not quite so mathematical as one might hope. Eventually, I plan to work out a pattern and will have to use my experience with this piece to write up a more useful explanation for determining the correct ratio.

Oh, and the sweater has been named. It's now "The Big Four-Oh" in honor of Leo's birthday. And I agree with any of you who share the sentiment that Leo doesn't look at all like he is 40.

June 14, 2006

The ugliest little swatches ever

This is really the first time I've done test swatches for a design for someone else's book. I've had pieces in books and I've had sketches accepted for publication in magazines, but normally I self publish so my swatch is always in the color and yarn that I intend to use. There was a part of me that felt it would be good to run out and buy the "right" colors of yarn, but there is no guarantee that it will actually be the yarn I use, so I decided to stick to stash yarn, almost exclusively. The result is swatches so horrible to the eye, that I feel I'm giving nothing away by sharing them.

They are sitting atop the stitch by stitch chart I've done up for my Silky Wool yarn. As insane as it sounds, even for my own use, I generally chart every stitch of the piece I plan to make.

I wanted to get everything in sunlight, last night, and while the days are long here, there's only really one little spot by the window that gets direct sunlight. Guess who gave me a hand with the photo shoot:

She was checking the lighting for me.

And no, I haven't been neglecting my girlfriendly duties, Leo's turtleneck is nearly done.

On the commute home, a couple days ago, I asked Leo "Hey, do you prefer your turtlenecks on the long side or on the short side."
"Oooh, I don't know, kind of medium. Helpful, huh?"
Indeed.
So this piece will probably be done before my next blog post, but getting Leo in front of a camera, may still be days away. From what I've seen of it on him, though, I think it'll be worth the wait...hubba hubba.

June 18, 2006

The Big Four-Oh Pattern Notes

Also known as "Curses Foiled Again".
This is the second sweater I've knit for Leo and neither have, yet, resulted in the end of our relationship. I will spare you my diatribe on the boyfriend sweater myth, because I'm simply too pleased to have this off the needles

I hope to have a properly modeled version of this for you soon. For now, you'll have to settle for it on me (and slightly rumpled).

Pattern notes after the bump.

Continue reading "The Big Four-Oh Pattern Notes" »

April 23, 2006

Ribbing ribbing ribbing ribbing ribbing

I took a couple rough photos of the machine knit cardi and cami

The pictures aren't so good because there was only a little daylight left when I took them. And I've been doing housework all day, so the hair; it is in no condition for photographing. But, I think it gives you a general idea of what the pieces look like.

I'm now fully engrossed in Leo's sweater.

This is the back piece. I'm about halfway to the armsceye. It looks thin, but it will block out much wider. So far so good. I got most of it done while watching a movie over at a friend's place. It was a great, relaxing evening.

Leo went out with some friends and brought me home this:

He’s so sweet. Little things like that make knitting miles of ribbing seem fun.

April 21, 2006

Well, in that case

I don't think I could have gotten a more positive response to good ol' Drake, if I had bribed you guys. So, I've cleaned up the pattern, fixed the typos (I hope) and posted him for sale.

People have made some great suggestions for modifications and variations. One I like in particular was to convert him to a messenger bag. While I no longer have the yarn or even the dyelot numbers to do that, I think it's worth mentioning for anyone who might be considering making one for themselves.

Curses

Next up, a possible exercise in futility. I want to knit Leo a sweater. I do this with a great deal of trepidation. Leo is not a fiber artist of any sort. He switches between calling it "sewing," "crocheting," and "knitting." When I wind, spin or knit yarn, his general thought is "Aren't there machines to do that?" I do not begrudge him this. He takes no end of joy in things that bore me to tears.

I have knit Leo a boatload of hats and I've even knit him a sweater before. He is always appreciative, but I have never knit him something he is totally satisfied with. The perfect item will always be lace weight thin and softer than silk, while still being manly in every way. Colors? Sure, as long as it's grey, brown, navy, or black.

So why do I want to knit him a sweater despite the fact that he hasn't asked and I'm pretty sure he won't be entirely content with it? Well, I want to design a few men's garments, to fill out my pattern portfolio, and I think the design is one that marginally less picky men will like, but I also can't help myself. I think he's pretty darned wonderful and knitting is about the most special thing I can do for him, so dammit, he's getting a sweater.

I started with a trip to the LYS where I got 4 skeins of yarn.

All were dubbed "a little thick." But I informed him that it would just have to do and he could wear it when it's colder out. I love him, but I'm not knitting a sweater on needles smaller than US #3.
So he began the feel test.
The top was the finest, but the superwash merino just wasn't soft enough.
The alpaca was soft enough but too thick
The Cathay was dismissed out of hand. No interest there
The last was the Baby Cashmerino. Thin enough to be acceptable, soft enough to pass the test, and if bought in a different color it would do.

So I shopped online for some good colors and prices. I know my LYS doesn't carry the quantity and color selection required. Webs had the best price once the discount was applied and I made my order.

In the mean time, I swatched.

Yup, the whole thing will be in ribbing. May the knitting gods grant me the strength to finish this baby.

Both swatches have been through the washing machine and laid flat to dry so I know the yarn will survive his general MO for washing sweaters. And yesterday, after about a week of waiting, the yarn arrived.

That's 13 skeins of grey/blue Baby Cashmerino.

April 27, 2006

Keep going while the going is good

I've been cranking away on Leo's sweater, which I simply must find a name for since it's early stages bare a striking resemblance to someone else's sweater for a Leo. I am happy to report that while my Leo will be wearing a ribbed sweater, I have not accidentally designed a piece that is nearly identical to that one. But I do believe that the two men are cut from the same cloth (or should it be; knit from the same yarn.)

So, for the start of the sweater I cast on of about 120 stitches, and worked in ribbing for about 120 rows. In the world of exciting things to do, this rates at about a -3. But, we are at the early stages of knitting this piece and, like a relationship, the things that may annoy or bore me later, are simply delightful now.

So knowing that the thought of casting a new piece may feel like torture, by the time I finish the back piece, I've decided to leverage my existing enthusiasm and get the most tedious bits out of the way first.

So there is the back, knit up to the armsceye, with the front, cast on and knit for a few rows, sitting on top.
I gently blocked the back so you could see the fabric as it will be when completed. The first inch of each piece is knit on a slightly smaller needle so that the bottom edge won't flip out in some wonky way.

Now, when it comes time to knit the rest of the back, it won't seem quite so dreary. I'm thinking I'll need to knit both sleeves at the same time as well, to rid myself completely of second sleeve syndrome. Some people find knitting the sleeves first to be the best remedy, but in a man's garment which will be knit rather long, I suspect that this portion of the knitting will be the hardest to find motivation for. Time will tell if I'm correct.

I've also been spinning a little. I actually completed this skein several days ago.

It's the Redwood colorway from my Spunky Eclectic haul.

May 12, 2006

Thank god I'm knitting them both at once

You know, I'm not completely burned out on knitting navy blue ribbing, but I'm pretty sure that having to start another sleeve from scratch would be a challenging endeavor. I think that knitting them both at once is a good choice. It's a bit of a bummer knitting all those stitches in a row and knowing I have many increases ahead of me, but in the few minutes I'm finding to knit each day, I can usually zone out and enjoy myself. My mind definitely starts wandering, yearning for future projects, but there's also that side of the project that's all about doing something special for Leo. I know, so sappy.

So those are the two sleeves, almost a third of the way to the sleeve cap. They are perched upon the blocked back piece, for scale.

Having folks take my quiz has been really fun, by the way. It's interesting to see how folks imagine my life to be. For those who didn't score so high, don't feel bad, it's not like most of that stuff comes up in day to day blogging.

May 8, 2006

2 out of 4 ain't bad

That's 2 out of the 4 big pieces for the Leo sweater, of course.

And this is not a sleeve:

It's the back of the sweater. Leo is not a super skinny man, it just needs some blocking.

Yah, I know that most people block at the END of the process, but I bet most of those people don't have a cool new blocking board and blocking wires. Actually, that's only gravy for me. I like to do my finishing as I go. It keeps me motivated.

Quite a few folks have asked me if I'll be using my machine to knit this piece. In this case, it won't be possible. My machine has no ribber, and the manual task of dropping the stitches that should be purled and using a latch hook to rework them, is tedious and makes my back ache. I'm sure I'll machine knit Leo a sweater in the future, but this piece is all hand knit.

I'm back working in Orange County this week, which means no bus, and lunch at my desk, so progress is slow on the sleeves. Knitting Gir was a nice little instant gratification project, but I'm hoping to crank through as much of the sleeves as possible over the next couple weeks.

June 14, 2006

The ugliest little swatches ever

This is really the first time I've done test swatches for a design for someone else's book. I've had pieces in books and I've had sketches accepted for publication in magazines, but normally I self publish so my swatch is always in the color and yarn that I intend to use. There was a part of me that felt it would be good to run out and buy the "right" colors of yarn, but there is no guarantee that it will actually be the yarn I use, so I decided to stick to stash yarn, almost exclusively. The result is swatches so horrible to the eye, that I feel I'm giving nothing away by sharing them.

They are sitting atop the stitch by stitch chart I've done up for my Silky Wool yarn. As insane as it sounds, even for my own use, I generally chart every stitch of the piece I plan to make.

I wanted to get everything in sunlight, last night, and while the days are long here, there's only really one little spot by the window that gets direct sunlight. Guess who gave me a hand with the photo shoot:

She was checking the lighting for me.

And no, I haven't been neglecting my girlfriendly duties, Leo's turtleneck is nearly done.

On the commute home, a couple days ago, I asked Leo "Hey, do you prefer your turtlenecks on the long side or on the short side."
"Oooh, I don't know, kind of medium. Helpful, huh?"
Indeed.
So this piece will probably be done before my next blog post, but getting Leo in front of a camera, may still be days away. From what I've seen of it on him, though, I think it'll be worth the wait...hubba hubba.

May 29, 2006

I love long weekends

Given my druthers, I'd gladly work 3 - 13 hour days a week to have 4 day weekends. Alas, that probably isn't going to happen for me so I'll just have to enjoy the long weekends bestowed upon us by federal holidays.

Leo's sweater is nearing the finish line. All the big pieces are done and assembled. It's still damp here and in need of some final blocking. The wash was just to get all the commuter grime off of it, but I'll do a proper steam block when it's dry. It'd probably be better to wet block it, since it's already wet and all, but I'm a strange girl.

This is the back view. The front is largely the same but the neck is a little lower.

While I'm waiting for the sweater to dry so I can start the neck, I've been knitting some socks. I'm one of those people who is more than happy to knit on DPNs. I have absolutely no aversion to them and find that socks zip along just merrily on them. However, I have some concern that I may not be able to take metal DPNs on the plane with me to India (nationally, it's not a problem, but internationally, there may be some issues). So I'm attempting the socks on two circulars method.

I have to admit, I don't care for it. To me, this method is slow and clumsy. I've improved the process for myself by clipping the two socks together, which resolves some of the issues I had with the socks constantly migrating away from each other and increasing the time it takes to go from knitting one sock to the other.

Even though I really do not like this method, now, I feel obligated to try to knit a whole pair in this manner. It may simply be a matter of acclimating to the technique. Even so, I'm not sure why this method is so popular amongst the DPN averse. In truth, the circulars simply act as two very long DPNs, so I'd think anyone who could master this technique, could certainly master the use of DPNs.

Ok, I'm off my soapbox here. It's true that there are merits to being able to knit two socks at once, and the circulars fold up more compactly than DPNs, so I still feel this endeavor is worthwhile.

I'm not sure what the yarn is, I've long lost the label. It looks a lot like Opal but it's not, it's some other, less known, self striping sock yarn.

You may have noticed that the underside is slightly different than the top, at least down at the toes. This is because I worked a short row toe, so I started from the ball of the foot, working flat to the toe then back down to the top of the foot before joining in the round. Personally, I prefer the idea of a bright red toe, so that's going to be the top.

May 22, 2006

Because he's worth every stitch

Since my post on Friday, I've done about 80 rows on Leo's sleeves. I am finally at the sleeve cap, which means no more increases. Not a moment too soon, I say. There were a few moments when I mentally psyched myself out and I wasn't sure I'd ever see the end of them.

There is actually a likely possibility that the sleeves are a little bit long. Personally, I'd rather have to shorten a ribbed sleeve than have to lengthen one. Ribbing is unidirectional. If you pickup and knit from the other direction, all stitches will be half a stitch offset from the point you picked them up. This means that lengthening a ribbed sleeve is best done by knitting a new cuff and grafting, in ribbing, to the base of the sleeve. I'm very comfortable with grafting in stockinette but ribbing is a whole other beast.

But you know, it's easy to find motivation when knitting for Leo. It's not all about eating dog cookies at our place. On Friday, Leo treated me to dinner at my favorite Italian restaurant.

He said he loved me so much, even the stains he leaves on his placemat are heart shaped.

After dinner, we made an attempt to go out and tear up the town, but having both gotten up around 6 am, we were pretty beat by 11pm and the bars still all seemed empty. Leo did take this cool picture of us reflected off the mirror behind the bar.

You can see his camera peaking through the bottles, if you look carefully.

It ended up being an early night, and a quiet weekend. On Saturday, I knit sleeves while I watched Memoirs of Geisha. It may not be as good as the book, but it's been quite a few years since I read the book and the cinematography alone was captivating enough to hold my interest. There were a few things I remembered well enough to feel like I could pick apart the movie a bit, but it never stopped me from enjoying it.

May 19, 2006

Pleading Patients Overlooked

I can't quite decide what my the PPO portion of my medical insurance is referring to. I thought it was shorthand for "the world is your medical oyster" but I'm finding myself a tad frustrated today. The short story is that I need to get some inoculations so I can take a business trip to India in July, which is a very cool opportunity but is involving a lot of effort I hadn't originally considered. I think I've sorted most of the confusion out in what appears to be the first instance of my insurance company being more helpful than the doctor's office. Who knew? Anyway, I have two sore upper arms and a yellow card detailing my immunities to some rather icky viruses. There was also a bit of time to knit on Leo's sleeves.

I will still need some boosters and a tetanus shot, as well as a few prescriptions, but I've got the stuff that needed a lot of lead time out of the way.

Working on Leo's sweater, I've given myself little leeway to do much else. Obviously, I knit Gir but there really hasn't been much else. I occasionally pick up my spindle which has some lovely alpaca on it.

It's not that I'm not enjoying spinning it, it's just that I really want to crank through Leo's sweater and I cannot spin and knit at the same time. But, imagine if I could...oh my own vision of Valhalla.

Knitting miles of ribbing does give me ample time to consider what comes next. I'll definitely be working on the clown hat, but what should I do in India. July = monsoon season in the area. Temperatures, apparently, can average around 120 degrees though I'm told it's quite a bit cooler where we'll be. Even so, I'm thinking small, portable, and able to be worked on mindlessly. All signs point to socks. I'm not a huge sock knitter, but I am feeling that 2 socks on 2 circs will prevent second sock syndrome AND be more likely to survive a trip through security and customs without a lot of explanation. I like working on DPNs, but having a preference for metal to wood means that's probably a bad idea.

So last night I ripped out a partially knit, now abandoned project that was started with some Socks that Rock in colorway, Carbon. It needed a bath and hanging to get the kinky bits out but now looks as good as new.

I also have some solid shades of koigu around and plenty of self patterning sock yarn, all of which will only take up a small amount of space in my luggage but which should easily entertain me for my 24 hour long commutes to and from India as well as the small amount of down time I'll have during the trip.

June 4, 2006

When birthday gifts come late, it means the birthday lasts longer

Some people give me way too much credit, and Julia is one of those people. I wish it were true that Leo's sweater were finished and blocking, as she suggested, but it's not quite the case. However, it is terribly close to being done.

I'm just working on the neck now.
Leo looks amazingly good in turtlenecks, however, with sweaters, he finds that his stubble is always tearing the turtleneck apart, wearing out the sweater long before it's truly ready to be retired. This sweater will have a mock turtleneck and several separate full turtleneck pieces to tuck in and switch out as necessary. If that just doesn't work, I have the yarn and can simply remove the bind off on the mock turtleneck and knit a full turtleneck each time one wears out.

Leo has tried on the sweater up to the point you saw it in the last post. He has declared that the fit, fabric and look are all up to his standards, so I'm feeling pretty good about the endeavor.

For those of you who knit a lot of raglans, you may have noticed that the shoulder shaping is a bit different than one might expect. Instead of a steady slope, there is a true shoulder shape at the top. Do you see what I mean?

Here's a little sneak peek of how I did that.

There is an extra "raglan" running along the top of the shoulder that extends from the neckline to about the end of the shoulder (I actually stopped about a half inch short of the final shoulder length). Calculating it was an interesting challenge and I did it by printing out gauge sized charts and origami folding it to the right shape. This is not quite so mathematical as one might hope. Eventually, I plan to work out a pattern and will have to use my experience with this piece to write up a more useful explanation for determining the correct ratio.

Oh, and the sweater has been named. It's now "The Big Four-Oh" in honor of Leo's birthday. And I agree with any of you who share the sentiment that Leo doesn't look at all like he is 40.

June 18, 2006

The Big Four-Oh Pattern Notes

Also known as "Curses Foiled Again".
This is the second sweater I've knit for Leo and neither have, yet, resulted in the end of our relationship. I will spare you my diatribe on the boyfriend sweater myth, because I'm simply too pleased to have this off the needles

I hope to have a properly modeled version of this for you soon. For now, you'll have to settle for it on me (and slightly rumpled).

Pattern notes after the bump.

Continue reading "The Big Four-Oh Pattern Notes" »

About the big four oh

This page contains an archive of all entries posted to Marnie, speak! Good girl. in the the big four oh category. They are listed from oldest to newest.

stealth knit is the previous category.

unnamed shawl is the next category.

Many more can be found on the main index page or by looking through the archives.

Site Info

Powered by
Movable Type Pro 5.14-en